Tuesday, January 8, 2013

Track Hoe in the Tabernacle

I arrived at the temple site just at sunset tonight and was surprised to see the trucks still working.  The south side trench has been considerably widened.  
All four of these machines were in motion tonight, working together, it seemed.
The pavement which used to be First South was pulled up while I watched.
The track hoe removed dirt from around the piers.  Four piers can be seen in this picture, which support I-beams, which in turn support the shell of the tabernacle.
And this track hoe inside the building was working so fast that I struggled to get a good picture.
The little front-end loader removed the dirt excavated by the inside track hoe.  I can only guess that the boulders were once part of the original foundation.

Monday, January 7, 2013

The Tabernacle is an Island

Was I in for a surprise when I arrived at the temple site today!  Excavation work is progressing rapidly.
Track hoes dug away the ground around this red ladder to the point that it's no longer useful.
I'm actually not the sort of person who has watched much construction before, but I don't know why. It's amazing to see how fast these machines can work.  I counted 5 track hoes at the site today, all working their hearts out.  This track hoe seems to be making plans to go inside.
Seriously, no one can use this ladder where it is.
Mr. Track Hoe and two of his little brothers worked rapidly on the south side.  Notice that the large track hoe is working from what used to be 100 South.
Excavation is progressing on the east side, too.  The retaining wall between the tabernacle and University Avenue is being extended west, along the north of the building.
This is the excavated trench along the north face.  The track hoe on the right was waiting for a dump truck to return so he could continue working.  I later watched him use his shovel to push through the frozen edges of the trench while between trucks.
This is the north face from University Avenue.  
One of the track hoes pushed dirt against the north side of the retaining wall.
The pile driver was quiet while I was at the site, but the vertical beams in the ground behind him are new, likely the result of his handiwork.  He would have driven in the beams for the extension of the retaining wall, too.
This is a little archaeology study of the ground beneath the north entrance. 
Excavation work hasn't begun yet on the west side, but workmen were busy there.  The white truck belonged to a welder who worked on the beams below the southwest corner.
All four towers, including this southwest tower, are fully supported by I-beams.
My camera peeked into the building through the west windows to reveal interior excavation work.  Maybe the red ladder outside will find its way inside soon.
This is a detail of the interior I-beam work as seen through a western window.
Another western window peek shows more interior excavation.
This full view of the south side shows one of the tandem dump trucks in use at the site, which come and go quickly.  Unfortunately, it also shows the haze over Provo from a week-long inversion.

Tuesday, August 21, 2012

Crane At Work

The beauty of this building touches me every time I visit.
A lot of workers are now at the site.
Jacobsen rebuilt the original BY Academy building, now the Provo Library, preserving much of the original design and facade.
After watching for awhile, I realized that the men in the building were feeding material to the crane operator, who lifted stuff out.
This ladder-looking object was moved away from the building,
and in less than 20 seconds moved to workers on the north side of the site.
They quickly released it from the crane.
Working together, they removed the "rungs" from the metal.
It appears they have done this countless times.  These metal devices were most likely temporary supports installed after the fire to keep the building safe after the original, internal wooden structure burned.
My guess is they will reuse this brick, just as they did with BY Academy.
The crane operator stayed very busy, moving stuff out of the tabernacle, and moving things from one end of the building to the other.  It was fun to watch.
I wondered if the crane operator trained on one of these.

Saturday, July 28, 2012

Crane In Place


A crane is now in place on the old tabernacle grounds, giving hope that more aggressive work will start soon.
Now that 1st South is permanently blocked west from University, the chain link barrier is down  on the south side of the building.

Friday, June 22, 2012

Checking In

I peeked through the fence to see how the construction is progressing.
First South has been completely blocked off, which will be permanent.
A few workmen were there, is all.  I'll keep my eyes open.