It was bitter cold at the site, and I thought this was going to be my last picture this morning. |
To my surprise, a Nu Skin employee suggested a better vantage point. Both the black and white cranes were working today, but otherwise the site was pretty quiet. |
The construction cam doesn't show the entire roof of the annex. The steel forms in the center of this photo have been lifted out of the annex via the opening for the skylight. Also visible in this photo is the north lift station. |
I turned around so you could see our beautiful downtown. |
This is a view of those same openings from the post office lot. |
The new south entrance to the construction site can be seen in the upper center of this photo, behind the post office. |
The dirt ramp where trucks used to enter has been removed. The south lift station is behind Mr. Track Hoe. |
I have learned that these forms are the beginnings of a stairwell. |
This is a ground view of those forms. Behind, you can see supports for the forms for the garage roof. |
All four gables of the temple now have rakes. Notice the white steel beam across the top of the southeast tower. |
In addition, an octagonal white steel frame has been placed around the top of this tower in preparation for receiving the tower cap. |
The site was so quiet this morning that I could hear the welder working on the south gable. |
However, these two men were drilling into the steel decking on the northwest side of the roof, occasionally making a furious noise which could be heard for quite a distance. |
I see lots of progress when I look at this picture. |
It won't be long before I'll be looking for signs of spring. |