| The setting sun lit the tabernacle this evening. |
![]() |
| It was very quiet. |
![]() |
| I have never seen the building look so beautiful. |
![]() |
| Samantha Carter caught the southeast tower cap being placed for a measurement yesterday. |
![]() |
| Mr. Ladder is showing us which cap was temporarily lifted up. |
![]() |
| It will be put back soon, and will stay there. |
![]() |
| The three damaged gables are being rebuilt. This is the south gable. |
![]() |
| The east gable is getting rakes. |
![]() |
| The west gable received rakes last week. Notice the beehive opening in the gable which was filled with rebar and shotcrete earlier this year. |
![]() |
| I suspect all four gables will look like the original east gable. |
![]() |
| Perhaps you have noticed from the cam that the south entrance to the site turned into a drop off. |
![]() |
| The gates are blocked, and Mr. Track Hoe has cut away the dirt. |
![]() |
| The current entrance is now to the right, where it was until August so micropiles could be drilled. |
![]() |
| The dirt was moved to the east side and is now level with the lift station. |
![]() |
| All the scaffolding is off the foundation walls. |
![]() |
| The dirt ramp gives machines access to the east side. |
![]() |
| The new walls of the mechanical shop are now visible on the west side of the tabernacle. |
![]() |
| Tension cables will be placed in the trenches. After the concrete is poured, they will be pulled tight with hydraulic jacks. |
![]() |
| I hurried to get one last picture before the sun went to bed for the night. |
![]() |
| The rest of downtown Provo was decorated for Christmas. |
![]() |
| I have a few decorations at home, too. |